Risk analysis

Risk analysis

Risk analysis is performed pursuant to methodological guidelines set by the Ministry of Environment and its objective is to establish the level of risk to environmental and human health from contaminated soil, ground water and building structures. Part of the analysis is the derivation of the maximum acceptable contamination limits and basic design conception of the solution to minimize these risks (remedial measures).

Examples of successful projects

We have performed over one hundred risk analysis projects on industrial, agricultural, military and communal sites. e.g.: Léčiva Prague, Barva a Laky Kralupy n. Vlt., Bechyně airfield, Žatec airfield, Spolana Neratovice, Autopal Nový Jičín, Lovochemie Lovosice, Domažlice dry cleaners, Karlovy Vary water main and sewerage systems, ECKG Kladno, Diamo Stráž p R., Benzina Prague distribution warehouses, Czech Railways – railway depots, Danisco Foods Tábor. Our experts participated in the preparation of methodology defining mandatory procedures for elaborating risk analysis projects in the Czech Republic.